Updates?

This is getting old. My renovation is moving at a slow....slow....pace. We are about to move our move-in date....again. I wish I could blame someone, but alas....this is really just how it goes. If there was something to blame, it would be the inspection process. Naples is going through a housing and population expansion. The inspectors are very busy. 

That's enough Monday morning whining....

Here is the latest....

The arches and the wall on the front.....


Are gone


I decided to keep the rectangular windows.....


And add a sliding glass door. The window was moved, also.


The pool heather is being relocated, today.  Below, kitchen table area before...


And now it is being framed for all windows, no sliding door.


This is the process of removing windows and framing for hurricane windows....remove old windows...


Frame for concrete to surround new windows.


Once the concrete sets, block will be installed below the frame....rinse and repeat about sixteen times.

In other news, my daughter got her drivers license. If you live in the area, this may be a good time to stay off the roads :). 

It fells good to be back on my blog. It's the only place that feels like home. 

If you have missed any of this project, you can get caught up:
My Next Project
My Architect
The Plan
Removing the Walls


 
Previous
Previous

Home Renovation Sources - Naples, FL

Next
Next

Art Event at The Pink Pagoda